uMhlathuze Water WTW reservoirs

Two Stefanutti Stocks Oro Projects joint ventures constructed two water treatment works reservoirs for uMhlathuze Water in Richards Bay. Each contract entailed the construction of a 20-megalitre post-tensioned concrete reservoir with a domed roof and all associated bulk infrastructure, bulk earthworks and pipework. More information on these projects is available here.

Stefanutti Stocks Coastal constructed a 10-megalitre reinforced concrete reservoir for eThekwini Water and Sanitation in Umhlanga Rocks. The 6.4-metre-high reservoir comprises of 20 sloping wall bases, 16 floor slabs, 20 tapered walls and 36 columns and pedestals, all topped with a 250mm roof slab. More information on these projects is available here.

Stefanutti Stocks Coastal undertook a 7.5 megalitre expansion to the existing Umkomaas reservoir for Umgeni Water. The reservoir construction comprised of 12 tapered wall bases, 28 floor slabs, 12 cantilevered sloping walls and 24 columns and pedestals. All topped with a 200mm post-tension and pre-stressed concrete roof slab.